Physical

How do Route, Ground and Assure apply where errors have physical consequences?

What we will measure

Definitions are published before results. No measurement for this programme has been published yet.

Mission completion under injected faults
Share of missions completed after named faults are injected
Time to re-plan after losing an agent
Time from agent loss to a revised feasible plan
Unsafe-plan interception rate
Share of unsafe plans stopped by the monitor before execution
False-block rate
Share of safe plans blocked by the monitor

Connected projects

Connected projects
ProjectTypeProgrammeHOPn roleStatus
SWARMind

Software for coordinating groups of autonomous drones: a shared operating layer, on-board algorithms and mission planning.

Research projectPhysicalCoordinatorConcept
SAFE-CARE

An architecture for AI-supported assistance in elder care. Every planned action passes a safety gate before it is carried out.

Research projectPhysicalLeadConcept

Planned work

Planned work for the next twelve months, counted from the start of the programme.

Planned work
monthsProgrammeSummaryStatus
0–3PhysicalSimulation baseline with fault injection (ROS 2, Gazebo)Planned
3–6PhysicalDegradation curves and verification methodology notePlanned